Sam from Team51 was down over the week end and we moved some gravel around with his father's tractor ( big thanks to Sam and his dad)
What we were able to get done:
We Moved the porta potty away from the shop area
Filled the low spots at the mouth of the driveway to get rid of those mud puddles after every storm.
Put in drainage tile and gravel in the path heading out to the field.
Also added gravel to the path into the 2nd setup area.
The doorway of the church should be much drier moving forward.
Last but not leat added gravel around and into the fuel depot.
We also prepped a spot for the trailer... which will be showing up in the next couple of weeks.(storage)